
2 Operating A&D DataManagement 07/2011
2.4 Specifying the properties of the control components
© Siemens AG 2011 All Rights Reserved
2-56 SIMATIC A&D DataManagement Client - 07/2011
CP342-5 in V2 STEP7-project
STEP7 projects Version V2 store the data of a CP in the hardware data of the
CPU. Therefore create a reference to the S7-CPU.
ADDM opens the HW config tool under STEP7 to load V2 STEP7 projects into the
CP. Select the corresponding CP from the table in this tool and start the loading
procedure. Only at this point, the SDBs, which are already available in a V3 STEP7
project, are generated. Therefore, the loading process must be triggered out of HW
Config.
ADDM automatically detects whether it is a V2 or V3 STEP7 project.
If so-called FDL links are set up in addition to normal master-slave data, then
ADDM also transfers them when loading the CP.
Note
This data is also transferred when loading the S7-CPU if the "Transfer AS link
data” option is selected.
2.4.6 OP, TP and MP operator panels with ProSave
In ADDM, operator panels can be backed up, loaded and compared via ProSave
software. ProSave is also installed during the installation of ADDM.
Comentários a estes Manuais